Skip to content
Industrial UWB RTLS for Real-Time Visibility
Menu

FZ — Industrial Collision Avoidance Radar

The FZ Collision Avoidance Radar is a high-precision industrial anti-collision device designed for vehicles, loaders, forklifts, cranes, and mining trucks. It supports a detection distance over 100 meters, 30 cm accuracy, dual-relay output, strong anti-interference capability, and IP67 protection for harsh industrial environments.

SKU: FZ001
Main product image of the FZ anti-collision radar and audio-visual alarm with ‘Precise Anti-Collision’ label.

Transmission & Network

Primary Transmission
Ethernet (RJ45)
Network Topology
Wired

At-a-Glance

Frequency Band
6.246 – 7.4 GHz
Communications & Interfaces
RS485
Power Input
DC 12–24V
Hot-swappable Battery
No
Average Power
< 5W
Ingress Protection
IP67
Operating Temperature
−40°C to +80°C
Dimensions
122 × 137 × 45 mm
Weight
< 1.2 kg
Accuracy: 30cm
Range: 100m
Temp: -40~80°C
Weight: 1200g

Description

The FZ Industrial Collision Avoidance Radar is a high-precision anti-collision system designed specifically for industrial vehicles and machinery. With a detection distance over 100 meters and ±30 cm accuracy, it offers reliable and stable safety protection for various industrial operations.

The radar features dual relay outputs, multi-level alarm settings, strong anti-electromagnetic interference capability, and IP67-rated protection to ensure continuous operation in harsh conditions such as dust, vibration, humidity, and temperature extremes.

Real-time distance measurement between two FZ collision avoidance devices


Key Features

✔ 1. Long-Range and High-Precision Detection

  • Supports >100 meters detection distance in open air

  • High collision accuracy: ±30 cm

  • Suitable for cranes, loaders, forklifts, mining trucks, and other vehicles

✔ 2. Industrial-grade Anti-Interference

  • Superior resistance to electromagnetic interference

  • Stable communication in steel plants, mining sites, manufacturing workshops

✔ 3. IP67 Protection

  • Dust-proof

  • Rain-proof

  • Shock-resistant

  • Ensures reliable operation under extreme conditions

✔ 4. Dual Relay Output

  • Supports 2 channels normally open

  • Supports 2 channels normally closed

  • Easy integration with horns, lights, vehicle controllers, PLC, and alarm systems

✔ 5. Ultra-Flexible Power and Communication

  • Compatible with DC12–24V

  • Supports RS485 communication

  • MODBUS-RTU optional

✔ 6. 24/7 Continuous Operation

  • Designed for industrial duty cycles

  • No calibration required after installation

  • One-time setup and long-term stability

Collision avoidance hazardous zone diagram showing FZ radar protecting loader and forklift


Application Scenarios

✔ Loader Collision Prevention

Used for loader reversing safety, ensuring vehicle–vehicle and vehicle–personnel protection.

✔ Overhead Crane Anti-Collision

Widely applied in steel mills, warehouses, and material handling cranes.

✔ Forklift Anti-Collision

Provides real-time alarm during aisle operation or blind-spot areas.

✔ Mining Truck Anti-Collision

Supports long-distance detection for mining transport vehicles.

✔ Engineering Vehicles

Suitable for bulldozers, excavators, and underground transport vehicles.


Package Includes

  • 1 × FZ Collision Avoidance Radar

  • 1 × Mounting Bracket

  • 1 × Installation Accessories

  • 1 × User Manual


Specifications

Power InputDC 12–24V
Power Consumption< 5W
Communication InterfaceRS485
Mounting MethodScrew or bracket mounting
GNSS SupportOptional
Working Frequency6.246 – 7.4 GHz
485 Baud Rate115200 (other baud rates customizable)
Antenna Gain5 dBi
Detection Distance> 100 m (unobstructed)
Collision Accuracy< ±30 cm (unobstructed)
Measurement Frequency1–10 Hz adjustable
Communication ProtocolRS485 (MODBUS-RTU optional)
Anti-Interference DesignStrong anti-electromagnetic interference
Operating Temperature−40°C to +80°C
Operating Humidity0%–90% non-condensing
Storage Humidity0%–90% non-condensing
Device Dimensions122 × 137 × 45 mm
Device Weight< 1.2 kg
Relay Output2 relays (normally open + normally closed)
Protection RatingIP67

Values are typical unless stated otherwise.


Wiring & Connections

Connectors

RS485

Installation

FZ anti-collision radar base station and audio-visual alarm installed on a large wheel loader for vehicle safety monitoring.

Compatible / Accessories


Mechanical Drawings

Dimension diagram of the FZ anti-collision audio-visual alarm showing height, width, and mounting structure.
Z collision avoidance radar device dimensions showing front, side, and bottom measurements for installation reference.

🌍 Industries where this device is deployed

FAQs

Procurement (Device & Data Layer)

Designing collision avoidance systems? Define safety logic before RFQ.<br />

Clarify collision scenarios, response time, alert paths, and fail-safe behavior<br /> before RFQ. This helps lock safety configuration early and avoid redesign later.<br />

Ready to Deploy RTLS?

Share your site layout and accuracy needs--we'll suggest a practical setup.

Contact Us